Find the perfect color for your facade
Get the appBeschleunigt abbindender Zementestrich für alle Estricharbeiten
Accelerated setting and drying cement screed for all screed works, as bonded screed, screed on separating layer, screed on insulation layer (floating screed) and heating screed, screed repairs and screed additions, can be used outside and inside. Can be walked on and loaded faster than normal setting screed, mix with water only. No further admixtures necessary. Working time 60-90 minutes, after 12 hours can be walked on after 12 hours, can be covered after 4 days (note residual moisture!).
DIN EN 13813: CT-C35-F6.